5. After the Job¶
Check the board¶
The down camera can check every footprint: is a part there, and how far off is it?
python -m pnpvision check-board "jobs/Test PCB-top-0603.job.json"
For each footprint it prints PLACED or MISSING with the offset in mm and degrees, and saves
a photo in board_check_<time>/. --only R1 R5 checks a few parts.
The report¶
python -m pnpvision report --out report_latest
writes, from the event log (pnp_events.sqlite):
| File | Contents |
|---|---|
summary.txt |
per run: picks good/tried, placed, parts per hour, rejects, vision verdicts |
cycles.csv |
per part: cycle time and its phases (pick, inspect, turn, place, feeder wait) |
vision_review.csv |
every up-camera decision (PASS / REJECT / EMPTY) with photo, size, angle and a human_agrees column to fill in |
placement_review.csv |
every board-check decision with green share, dx/dy/error and angle |
sheet_*.jpg |
contact sheets of the photos, one per run |
Examples: Sample Images and Data.
Keep the evidence¶
Photo folders grow by about 1 GB per day of runs. Back up pnp_events.sqlite, report_latest/
and results/; delete old job_*/ photo folders when you no longer need them.
Remove the board¶
Loosen the adjustable mount and lift the board straight up. Empty the reject bin.
Next: Shutdown.